9763
Date Filed:
November 06, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND
|
9759
Date Filed:
October 17, 2024
CHABERTON SOLAR PAHAR LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC FACILITY IN CAROLINE COUNTY, MARYLAND
|
9755
Date Filed:
September 25, 2024
TPE MD PR53, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT 4 CO-LOCATED SOLAR PHOTOVOTAIC GENERATING FACILITIES TOTALING 15 MWAC IN PRINCE GEORGE'S COUNTY, MARYLAND
|
9753
Date Filed:
September 09, 2024
ECONOX RENEWABLES INC.'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.04 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND.
|
9752
Date Filed:
September 06, 2024
CHABERTON SOLAR BEARTOOTH LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.67 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND
|
9748
Date Filed:
July 11, 2024
BALTIMORE GAS AND ELECTRIC COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE BRANDON SHORES RETIREMENT MITIGATION PROJECT.
|
9747
Date Filed:
July 09, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.125 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
|
9746
Date Filed:
July 08, 2024
ELK DEVELOPMENT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.142 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
|
9743
Date Filed:
June 11, 2024
CROOM ROAD SOLAR, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
|
9742
Date Filed:
May 22, 2024
TPE MD KE51, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN KENT COUNTY, MARYLAND.
|
9740
Date Filed:
May 20, 2024
POCOMOKE CITY COMMUNITY ENERGY INITIATIVE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN WORCESTER COUNTY, MARYLAND.
|
9739
Date Filed:
May 10, 2024
CHABERTON SOLAR ORCHARD HILL LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.24 MW SOLAR PHOTOVOLTAIC FACILITY IN QUEEN ANNE’S COUNTY, MARYLAND.
|
9736
Date Filed:
April 23, 2024
SPRING VALLEY SOLAR 1, LLC 'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.25 MW SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
|
9735
Date Filed:
April 22, 2024
CHABERTON SOLAR SUNSHINE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CARROLL COUNTY, MARYLAND.
|
9734
Date Filed:
April 22, 2024
OAKLAND SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC FACILITY IN GARRETT COUNTY, MARYLAND.
|
9733
Date Filed:
April 18, 2024
CHABERTON SOLAR RAMIERE LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0 MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN MONTGOMERY COUNTY, MARYLAND.
|
9731
Date Filed:
April 08, 2024
DRY RIDGE SOLAR 1, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
|
9726
Date Filed:
March 05, 2024
CHABERTON SOLAR SUGARLOAF I LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0 MW SOLAR PHOTOVOLTAIC GENERATING
FACILITY IN MONTGOMERY COUNTY, MARYLAND
|
9725
Date Filed:
February 23, 2024
CHABERTON SOLAR PINE ROCK LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.0-MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN CARROLL COUNTY, MARYLAND.
|
9723
Date Filed:
January 31, 2024
CROCKETT SOLAR I, LLC’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 61.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN TALBOT COUNTY, MARYLAND.
|
9717
Date Filed:
October 13, 2023
CHABERTON SOLAR WILD TURKEY LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
|
9716
Date Filed:
October 02, 2023
CHABERTON SOLAR BONNVILLE, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN HARFORD COUNTY, MARYLAND
|
9714
Date Filed:
September 28, 2023
CHABERTON SOLAR SNOW, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4.0-MEGAWATT SOLAR PHOTOVOLTAIC FACILITY IN WORCESTER COUNTY, MARYLAND
|
9713
Date Filed:
July 19, 2023
BALTIMORE GAS AND ELECTRIC COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FITZELL THIRD AND FOURTH CIRCUITS RECONFIGURATION PROJECT
|
9710
Date Filed:
June 29, 2023
PORTER MILL, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 45.80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
|
9698
Date Filed:
April 26, 2023
DELMARVA POWER & LIGHT COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD AN EXISTING 138 KV OVERHEAD TRANSMISSION LINE ON EXISTING RIGHT-OF- WAY FROM THE VIENNA SUBSTATION IN DORCHESTER COUNTY TO THE MARYLAND/DELAWARE STATE LINE
|
9699
Date Filed:
April 26, 2023
POTOMAC ELECTRIC POWER COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD AN EXISTING DOUBLE CIRCUIT 230 KV OVERHEAD TOWER LINE ON EXISTING RIGHT-OF-WAY FROM THE OAK GROVE SUBSTATION TO THE TALBERT SUBSTATION IN PRINCE GEORGE'S COUNTY
|
9694
Date Filed:
March 15, 2023
KUMQUAT & CITRON CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 7.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
|
9685
Date Filed:
October 28, 2022
COMMUNITY POWER GROUP, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ANNE ARUNDEL COUNTY, MARYLAND
|
9684
Date Filed:
October 26, 2022
ROSEHIP CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND.
|
9682
Date Filed:
September 22, 2022
TEMO RENEWABLES, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.9 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
|
9677
Date Filed:
March 09, 2022
CONSTELLATION POWER SOURCE GENERATION, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO MODIFY THE PERRYMAN GENERATING STATION
|
9675
Date Filed:
January 20, 2022
WAYPOST SOLAR PROJECT, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 92 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND
|
9669
Date Filed:
August 03, 2021
POTOMAC EDISON COMPANY'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO REBUILD DOUBS-GOOSE CREEK TRANSMISSION LINE.
|
9663
Date Filed:
April 27, 2021
CPV BACKBONE SOLAR, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 175 MW SOLAR PHOTOVOLTAIC GENERATING
FACILITY IN GARRETT COUNTY,MARYLAND.
|
9662
Date Filed:
April 12, 2021
COSTEN SOLAR, INC'S APPLICATION FOR CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 10.625 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
|
9658
Date Filed:
January 15, 2021
BALTIMORE GAS AND ELECTRIC COMPANY’S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FIVE FORKS TO WINDY EDGE TRANSMISSION LINE RELIABILITY PROJECT.
|
9656
Date Filed:
December 01, 2020
KUMQUAT & CITRON CLEANTECH, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 7.20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND
|
9652
Date Filed:
September 02, 2020
PTR HOLDCO, LLC'S APPLICATION FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 30 MW SOLAR GENERATING FACILITY IN HARFORD COUNTY, MARYLAND.
|
9642
Date Filed:
April 17, 2020
APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE BUSH RIVER CROSSING PROJECT
|
9636
Date Filed:
February 21, 2020
THE APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE FIVE FORKS TO MARYLAND/PENNSYLVANIA BORDER TRANSMISSION LINE RELIABILITY PROJECT.
|
9635
Date Filed:
February 14, 2020
THE APPLICATION OF NEW MARKET SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 50 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND.
|
9620
Date Filed:
August 26, 2019
IN THE MATTER OF THE APPLICATION OF LIGHTSOURCE RENEWABLE ENERGY DEVELOPMENT, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN ST. MARY'S COUNTY, MARYLAND
|
9608
Date Filed:
May 17, 2019
IN THE MATTER OF THE APPLICATION OF SPECTRUM SOLAR, LLC FOR THE CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.6 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
|
9600
Date Filed:
December 20, 2018
IN THE MATTER OF THE APPLICATION OF BALTIMORE GAS AND ELECTRIC COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY FOR THE KEY CROSSING RELIABILITY INITIATIVE TRANSMISSION LINE PROJECT.
|
9499
Date Filed:
November 30, 2018
IN THE MATTER OF THE APPLICATION OF MORGNEC ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECCESITY TO CONSTRUCT A 45.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND.
|
9495
Date Filed:
November 13, 2018
IN THE MATTER OF THE APPLICATION OF KIEFFER FUNK, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 11.80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND.
|
9496
Date Filed:
November 13, 2018
IN THE MATTER OF THE APPLICATION OF BLUEGRASS SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AN 80 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
|
9483
Date Filed:
June 08, 2018
IN THE MATTER OF THE APPLICATION OF CITIZENS UB SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.9 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN THE TOWN OF UNION BRIDGE AND CARROLL COUNTY, MARYLAND.
|
9482
Date Filed:
May 31, 2018
IN THE MATTER OF THE APPLICATION OF CP CRANE LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AUTHORIZING THE MODIFICATION OF THE CHARLES P. CRANE GENERATING STATION IN BALTIMORE COUNTY, MARYLAND.
|
9477
Date Filed:
January 23, 2018
IN THE MATTER OF THE APPLICATION OF CHERRYWOOD SOLAR I, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 202 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CAROLINE COUNTY, MARYLAND.
|
9471
Date Filed:
December 27, 2017
IN THE MATTER OF THE APPLICATION OF TRANSOURCE MARYLAND LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT TWO NEW 230 KV TRANSMISSION LINES ASSOCIATED WITH THE INDEPENDENCE ENERGY CONNECTION PROJECT IN PORTIONS OF HARFORD AND WASHINGTON COUNTIES, MARYLAND
|
9470
Date Filed:
December 22, 2017
IN THE MATTER OF THE APPLICATION OF THE POTOMAC EDISON COMPANY FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO MODIFY THE RINGGOLD-CATOCTIN TRANSMISSION LINE N FREDERICK AND WASHINGTON COUNTIES, MARYLAND.
|
9469
Date Filed:
December 21, 2017
IN THE MATTER OF THE APPLICATION OF ENERGY VENTURES IPP, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 10 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND
|
9465
Date Filed:
November 09, 2017
IN THE MATTER OF THE APPLICATION OF TPE MARYLAND SOLAR LAND HOLDINGS, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.425 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND (PRINCE GEORGE'S COUNTY 21).
|
9466
Date Filed:
November 09, 2017
IN THE MATTER OF THE APPLICATION OF TPE MARYLAND SOLAR LAND HOLDINGS, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.25 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND (PRINCE GEORGE'S COUNTY 18).
|
9464
Date Filed:
September 26, 2017
IN THE MATTER OF THE APPLICATION OF MD SOLAR 1, LLC FOR THE CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 32.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CHARLES COUNTY, MARYLAND
|
9463
Date Filed:
September 25, 2017
IN THE MATTER OF THE APPLICATION OF MD SOLAR 2, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 27.5 MW SOLAR PHOTOVOLTAIC GENERATION FACILITY IN CHARLES COUNTY, MARYLAND.
|
9457
Date Filed:
September 06, 2017
IN THE MATTER OF THE APPLICATION OF RICHFIELD SOLAR ENERGY LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 50 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND.
|
9454
Date Filed:
June 14, 2017
IN THE MATTER OF THE APPLICATION OF BRICK KILN ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WICOMICO COUNTY, MARYLAND.
|
9451
Date Filed:
May 10, 2017
IN THE MATTER OF THE APPLICATION OF CHESAPEAKE SOLAR LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN CECIL COUNTY, MARYLAND.
|
9450
Date Filed:
April 25, 2017
IN THE MATTER OF THE APPLICATION OF CASPER SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 36.70 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
|
9446
Date Filed:
April 11, 2017
IN THE MATTER OF THE APPLICATION OF SOL PHOENIX SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 2.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN PRINCE GEORGE'S COUNTY, MARYLAND.
|
9439
Date Filed:
February 17, 2017
IN THE MATTER OF THE APPLICATION OF BIGGS FORD SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 15.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND.
|
9438
Date Filed:
December 23, 2016
IN THE MATTER OF THE APPLICATION OF MORGNEC ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 57.04 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND.
|
9437
Date Filed:
December 22, 2016
IN THE MATTER OF THE APPLICATION OF CPV MARYLAND, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY AUTHORIZING THE MODIFICATION OF ITS ST. CHARLES GENERATING STATION.
|
9436
Date Filed:
December 21, 2016
IN THE MATTER OF THE APPLICATION OF JONES FARM LANE SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 56.70 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND.
|
9434
Date Filed:
December 20, 2016
IN THE MATTER OF THE APPLICATION OF EGYPT ROAD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 45.90 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN THE CITY OF CAMBRIDGE, MARYLAND.
|
9429
Date Filed:
October 07, 2016
IN THE MATTER OF THE APPLICATION OF LEGORE BRIDGE SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
|
9426
Date Filed:
September 19, 2016
IN THE MATTER OF THE APPLICATION OF MASON DIXON SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 18.4 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND.
|
9413
Date Filed:
January 14, 2016
IN THE MATTER OF THE APPLICATION OF DAN'S MOUNTAIN WIND FORCE, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 59.5 MW WIND ENERGY GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
|
9412
Date Filed:
December 21, 2015
IN THE MATTER OF THE APPLICATION OF TODD SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN DORCHESTER COUNTY, MARYLAND
|
9408
Date Filed:
December 01, 2015
IN THE MATTER OF THE APPLICATION OF PERENNIAL SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AN 8.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND
|
9409
Date Filed:
December 01, 2015
IN THE MATTER OF THE APPLICATION OF GATEWAY SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 12 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND
|
9407
Date Filed:
November 09, 2015
IN THE MATTER OF THE APPLICATION OF MASSEY SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 5.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
|
9405
Date Filed:
November 06, 2015
IN THE MATTER OF THE APPLICATION OF LONGVIEW SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 15.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND (LS-SEABEACH SOLAR FARM)
|
9403
Date Filed:
October 30, 2015
IN THE MATTER OF THE APPLICATION OF LONGVIEW SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 20.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WORCESTER COUNTY, MARYLAND
|
9402
Date Filed:
October 29, 2015
IN THE MATTER OF THE APPLICATION OF BIG SPRING SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 3.5 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND
|
9400
Date Filed:
October 20, 2015
IN THE MATTER OF THE APPLICATION OF DAN'S MOUNTAIN SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 18.36 MW SOLAR PHOTVOLTAIC GENERATING FACILITY IN ALLEGANY COUNTY, MARYLAND
|
9399
Date Filed:
October 08, 2015
IN THE MATTER OF THE APPLICATION OF ONEENERGY BAKER POINT SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 9.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN FREDERICK COUNTY, MARYLAND
|
9395
Date Filed:
September 04, 2015
IN THE MATTER OF THE APPLICATION OF PINESBURG SOLAR LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT AN 8.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN WASHINGTON COUNTY, MARYLAND
|
9392
Date Filed:
August 21, 2015
IN THE MATTER OF THE APPLICATION OF ONEENERGY IBIS SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 6.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN SOMERSET COUNTY, MARYLAND
|
9387
Date Filed:
July 10, 2015
IN THE MATTER OF THE APPLICATION OF ONEENERGY BLUE STAR SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 6.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN KENT COUNTY, MARYLAND
|
9383
Date Filed:
June 16, 2015
IN THE MATTER OF THE APPLICATION OF ONEENERGY SUNFISH SOLAR, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 6.0 MW SOLAR PHOTOVOLTAIC GENERATING FACILITY IN QUEEN ANNE'S COUNTY, MARYLAND
|
9380
Date Filed:
May 11, 2015
IN THE MATTER OF THE APPLICATION OF GREAT BAY SOLAR I, LLC FOR A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY TO CONSTRUCT A 150.0 MW SOLAR PHOTOVOLTAIC GENERATIONG FACILITY IN SOMERSET COUNTY, MARYLAND
|